THERMOBOND 3

POWDER COATING FILLER

new thermobond 3 picture for all web sight.jpg

CONGRATULATIONS TO OUR NEW UK DISTRIBUTOR

MALDON SHOTBLASTING AND POWDER COATING 


CURING INSTRUCTIONS:

Thermobond 3 powder coating filler must be cured by heat. 

Cure recommendations are as follows:

10 minutes @ 375 degrees F surface temp
07 minutes @ 400 degrees F surface temp
05 minutes @ 425 degrees F surface temp

Longer cure time at lower temperatures is recommended to
allow the metal filler material to adhere properly to the substrate without blistering. 

Thermobond 3 powder coating filler will not air dry.

Order Thermobond 3 

thermobond 3 powder coating filler for metal repair and body filler